Massive expansion of Sirata Beach Resort approved, will bring two new hotels to St. Pete Beach
/After months of deliberation and testimony from the public and parties involved, the St. Pete Beach commissioners approved the plans for the controversial Sirata Beach Resort expansion.
In a 3-2 vote Tuesday evening, February 27th, commissioners greenlighted the conditional use permit (CUP) for the construction of a 290-key luxury JW Marriott hotel, a limited-service 130-key Hampton Inn, and a massive revamp of the existing 382-key resort at 5300 Gulf Boulevard.
The narrowly passed vote is a continuation of the nearly 11-hour public hearing last week when the newly appointed commissioners made a motion to defer the decision.
Read More

St. Petersburg will test a new plant-based approach to managing stormwater as part of a $7 million project coming to one of the city’s most flood-prone areas.
The city will install eight HydroPlanters, which are modular rain gardens designed to slow and filter rain runoff before it enters the city’s stormwater system.
Each rain garden is about five feet long, three feet wide, and two-and-a-half feet deep.
Filled with specially designed soil, grasses, shrubs, and small trees, the boxes will be installed in an L-shaped configuration along a city-owned grassy area near the intersection of 50th Avenue North and 7th Street North.
During heavy rain, water from the street will flow into the planters and filter through the soil and vegetation. It will then drain into the city’s stormwater system and eventually the 54th Avenue Canal.